rails_etc
Hobbyist-
66
Points
Rank:
Track Layer
After trying to close the bridge multiple times without unlocking it, I thought a warning was in order. It will always be up and locked when the layout is not in use.
-
66
Points
Rank:
Track Layer
I completely forgot to share on here – my entire layout is now on its legs! Ready to operate? Goodness no – there’s a lot of track repair that needs to be done before I get the wiring back on. But just to have it this far is an amazing feeling.
Ignore the chaos and clutter. It’s an active work zone.
- View more comments
-
66
Points
Rank:
Track Layer
Fourth section of the layout is up, and I think I have the plan for all the others going forward. It’s all coming together now!
-
66
Points
Rank:
Track Layer
Two more sections are up. They’re not connected yet, and I’m not redoing the wiring until I get all sections connected. But it’s satisfying to see it starting to come together and put a couple of cars on. Chief Engineer Lane Tyson-Rales sure has his work cut out for him.
-
66
Points
Rank:
Track Layer
Hi, I’m Alan, owner of the HO scale Midwest Shortline (there is currently a Facebook page, with a website under construction). This used to be my grandfather’s layout. He passed last year, and I inherited the layout and moved it to my home back in May. Due to various other commitments, so far I have only put one section (out of nine) back on…