Building a vineyard!🍇
- View more comments
-
Track Work - Caboose Industries Extended Ground Throws
The previous post discussed the caboose industries ground throws on my layout, with a particular emphasis on #206S (the beside-switch variant). 5 of the switches on my layout are too far from the edge to comfortably reach with my arm, and therefore, I needed some other way to flip them. Caboose Industries had a solution, with their #105R…
-
Track Work - Caboose Industries Ground Throws
All the switches on my layout (for now, at least), are utilizing Caboose Industries ground throws. These ground throws are small, relatively inexpensive (in comparison to motorized switch machines) mechanisms that function similar to actual switch levers. The majority of the switches on the layout use #206S. This model features internal…
-
Track Work - Switches. Lots of Switches.
Before I could finish the mainlines (at least, finish them as much as I could considering this is only half the layout), I had to lay switches. This was a pretty quick & easy process. Once I figured out where the switch needed to go, I placed two drops of glue—one at the end of the switch and another underneath the frog—and lay the…
-
Track Work- Roundhouse Curve
One of the major design features of the yard is the 180-degree curve that will eventually run around the roundhouse. There is no roundhouse yet, but I have nick-named it Roundhouse curve nonetheless.
I soldered 2 full-length (30″) sections of flex track together for each of the 3 tracks going around the curve. The first piece of track, which…
-
Track Work - The Mainline Crossover
One of the most important sections of track on the layout is the crossover between the double mainlines that is placed front-and-center on the layout. I toyed around with the placement of this crossover for a while before choosing this spot, since it will allow trains to come out of the reversing loop in the yard and move straight to the…
-
Beginning track work...
Almost 3 weeks elapsed between the completion of the cork, and the start of laying track. This was because I had precious little time to work on hobby stuff throughout the month of November. December 1st, 2025, I finally lay the first piece of track. It was a 30″ piece of the yard lead, glued down using DAP Apex Plus siliconized caulk, clear.…
-
Laying the Cork
Following the completion of the benchwork, I began laying the cork roadbed. This process began on October 29th, 2025, when I drew lines with a sharpie, indicating where the track would go. The next day, I lay the first piece of cork, and for the next dozen days, that was all I did. I am using Midwest brand N scale cork roadbed that is glued…
-
Benchwork Construction (October 7th-16th)
The layout has already been under construction for 4 months, so the first posts will be making up lost time.
The first month (October 2025) started out with Benchwork construction. Lots of time on my hands, an affinity for working with tools, and ADHD-fueled hyper fixation allowed me to complete this task in just 9 days, start to finish…